As the Valentini Ice-cream headquarters, a full office was constructed within an empty shell warehouse. Upon drywall being finished, the office received paint, flooring, and brand new ACT. To bring in an element of class, all new glass systems were added in each office to contribute to the sleek look. A bathroom with partitions and a double vanity as well as a fully functioning breakroom kitchenette were installed for future Valentini employees. In the warehouse, new lights were hung with the addition of several fire extinguishers .
category: Warehouses
Warehouses
The project featured here is a warehouse space of over 200,000 square feet. This complete interior buildout includes new warehouse lighting as well as two completely new office spaces. The two vacancies, each of over 2,500 square feet, received a variety of finishes some of which include acoustical ceiling, carpet, tile and LVT. A state-of-the-art store front system was installed to each office as well as MEP improvements.
Another success for the Dade Construction team!
This project consisted of a 28,498 square foot warehouse being converted into the print shop and storage facility for Ultimate Software. The inside was divided into office, print area and storage utilizing garage doors and floor to deck walls.
The project in subject, is a 10K sq. ft. warehouse space. Our buildout involved an entire brand new 1500 sq. ft. office. This buildout was scheduled for 70-day completion and was completed at 50. This space had ceramic tile installed throughout. The warehouse space was equipped with all new LED 20k Lumen light fixtures that had to been hanged from a 42’ deck, including controls. There was also a brand new 50’ ramp added to the warehouse with brand new store front system for this office. This space is one of the many spaces that we do for Flagler development.
This Project is total 27,213 SqFt warehouse build out with a 1,100 SqFt office build out. This is a full brand-new office build out. The build out consisted of all new partitions, floor tile installs in entire office space, ceiling, and all new units as well. This is one of the projects that was accomplished during the COVID-19 pandemic. We had to deal with the delays in the City and closing of many areas, but we managed to finish on time and turn over a great space.
This project was a 19,000 SqFt warehouse with a 3,500 Sqft office buildout. This included a full buildout with carpet tile, VC, acoustical ceiling and much more. In this space we also built a 2k sqft area for cold storage that was accessible through a high speed overhead door. This buildout also involved all new lighting fixtures in warehouse area with exhaust fan and an industrial 24ft in diameter fan. This was another great project that shows what DADE can do.
Consolidated Electrical: 3840 West 104th Street Suite 5, Hialeah Fl. 33018
Project consisted of a 20,520 square foot warehouse with 3,330 square foot.
Features a new vehicular ramp, hi bay lighting fixtures, open workspace and new restrooms.
Project consisted of a 10,260 square foot warehouse with 1,230 square foot.
Features a new vehicular ramp, stair case, hi bay lighting fixtures, open workspace, conference room and break room.
Interpavers Warehouse was an interior build out inside an industrial warehouse space. The project consisted of approximately 29,966 square feet of space to be fit out. The office space that was built had 3,070 square feet featuring four bathrooms and a large showroom for the tenant. The project also featured large marble tile floors and baseboards which give the space a very elegant look and feel. The warehouse portion received a new demising wall and illumination throughout.
Spectacular 30,000 square foot warehouse with 3,000 of office.
Features tiger wood floor and frameless glass. Built in less than 70 days.